Summer holidays are now over in the Netherlands so we are seeing some progress on the boat. Everything looks pretty good. We even have a couple of videos to share. In the bathroom we are especially pleased to see that the hanging toilet is being installed, so that we don't need to have it on a step. Also the ceiling height in the bathroom is 1.93 m just inside the door, and even a little more in the shower. This video show the progress including the large space on the left which will house the washing machine and freezer under the kitchen floor, the framework for the hanging toilet, and the shower stall which is set back a little into the bedroom. In the bedroom the radiators and drawers are already in and the cupboards (but without doors). The desk is also fitted although there will need to be a leg put in to support the long length. You can also see the steps up next to the bed. Still about 3 weeks work to go. The timber trims are ready to be installed. The hydraulic steering for the inside and outside steering positions is almost complete.
And the new black water tank is installed in the engine room. It is getting a bit crowded down there.
1 Comment
Ian McCauley
3/9/2016 08:32:22 am
Links from FaceBook running in a browser seem to work, but not the iOS app. Great that everything is coming along - but we'll have to wait for free wifi to watch the videos.
Reply
Your comment will be posted after it is approved.
Leave a Reply. |
AuthorWe are sharing stories about and travels on our barge Moondance. Archives
August 2023
|