Our electrician has been working on the boat and has completed installing lights, power points, cabling, fans etc in the bedroom and bathroom. Of course we are putting in LED lights and even some USB charging points. In the bathroom they have sent photos of a light over the mirror, ceiling lights and an extractor. We assume all the other power points etc. were also installed. It is all look very nice - and finished. In the engine room they have also started installing our equipment including new batteries and inverters. They have had to remove and upgrade a lot of the wiring in the engine room, but at least it will be all fixed and safe when we start cruising.
4 Comments
Shannon James
11/3/2017 12:43:36 pm
Wow looking great.
Reply
Rita Bergin
13/3/2017 11:55:37 am
looks very exciting - can't wait to see living quarters.
Reply
bruce munro
27/3/2017 01:07:31 pm
Classy looking finish, great improvement from when i saw it last. Well done with the vision of what a boat with good bones can be.
Reply
Your comment will be posted after it is approved.
Leave a Reply. |
AuthorWe are sharing stories about and travels on our barge Moondance. Archives
August 2023
|